Athens, Georgia
Piping for the new HVAC system in Studio 3 is in place and it looks like a prop for a 1950s scifi thriller.
Athens, Georgia
Athens, Georgia
Athens, Georgia
Athens, Georgia
Piping for the new HVAC system in Studio 3 is in place and it looks like a prop for a 1950s scifi thriller.
Athens, Georgia
Athens, Georgia
Athens, Georgia
Athens, Georgia
The recent rains have the stream out back running pretty fast.
Athens, Georgia
I now spend way too much time looking up at the infrastructure of our building. Way, way too much time.
Athens, Georgia
As if the demolition and renovation below me wasn’t enough, now we’re tearing our the walls across from my office for a different project.
Athens, Georgia
After eight years, it may be time to accept that this deck just wasn’t built right. The boards are too tight, even after a couple of sealings they still absorb and swell shut. Going to try opening up the gap when it dries out, but I foresee a spring of Trex installation.
Which, given the current run-up in prices of building material, is going to be pricey.
Athens, Georgia
A little pop of color on a very gray day.
Athens, Georgia
I noticed the wood above rotting and then photographed the metal below corroding.